(T/F) The most common form of IT-enabled organizational change is automation. |
T |
(T/F) Rationalization of procedures describes a radical rethinking of the business models. |
F |
(T/F) Failure to address properly the organizational changes surrounding the introduction of a new system can cause the demise of an otherwise good system. |
T |
(T/F) TQM describes the measurement of quality as 3.4 defects per million. |
F |
(T/F) Thorough testing is not required if, during the programming stage, the design documents are sufficiently detailed. |
F |
(T/F) The system is not in production until conversion is complete. |
T |
(T/F) Documentation reveals how well the system has met its original objectives. |
F |
(T/F) A data flow diagram offers a logical and graphical model of information flow, partitioning a system into modules that show manageable levels of detail. |
T |
(T/F) A structure chart is a bottom-up chart, showing each level of design, its relationship to other levels, and its place in the overall design structure. |
F |
(T/F) Object-oriented development is more incremental than traditional structured development. |
T |
(T/F) Objects are grouped into hierarchies, and hierarchies into classes. |
F |
(T/F) CASE tools facilitate the creation of clear documentation and the coordination of team development efforts. |
T |
(T/F) The oldest method for building information systems is prototyping. |
F |
(T/F) Prototyping is more iterative than the conventional lifecycle. |
T |
(T/F) A problem with prototyping is that the systems constructed using this method may not be able to handle large quantities of data in a production environment. |
T |
(T/F) End-user-developed systems can be completed more rapidly than those developed through the conventional systems lifecycle. |
T |
(T/F) One advantage of fourth-generation tools is that they can easily handle processing large numbers of transactions or applications with extensive procedural logic and updating requirements. |
F |
(T/F) In some forms of outsourcing, a company hires an external vendor to create the software for its system, but operates the software on its own computers. |
T |
(T/F) A primary benefit of offshore outsourcing is that this can substantially reduce hidden costs. |
F |
(T/F) Systems development activities always take place in sequential order. |
F |
What is the primary driving factor in firms to select domestic outsourcing firms to build system solutions? |
A |
The four kinds of structural organizational change enabled by IT, in order from least to most risky, are |
C |
Business processes are analyzed, simplified, and redesigned in |
A |
In automation |
D |
A bank has reworked its mortgage application process so that several steps are handled by computer software, and some steps are combined to reduce bottlenecks in processing. The goal is to gradually improve its efficiency over time. This is an example of |
B |
An upscale organic foods grocery chain is implementing an information system that will enable it to add same-day home delivery of groceries to its customers. This is an example of |
C |
In order, what are the first three steps in BPM? |
A |
________ provide(s) a methodology and tools for dealing with the organization’s ongoing need to revise and optimize its numerous business processes. |
B |
The idea that the achievement of quality control is an end in itself describes a main concept of |
D |
Which process develops a detailed description of the functions that a new information system must perform? |
B |
The entire system-building effort is driven by |
D |
Systems design |
B |
System design specifications that address the category of database design issues will include specifications for |
A |
Enabling organizations to make continual improvements to many business processes and to use processes as the fundamental building blocks of corporate information systems is the goal of |
A |
Transferring data from a legacy system to the new system would be defined by which category of system design specifications? |
D |
Determining methods for feedback and error handling would be defined by which category of system design specifications? |
B |
Unit testing |
C |
System testing |
B |
Acceptance testing |
D |
In a parallel conversion strategy, the new system |
C |
In the direct cutover conversion strategy, the new system |
B |
Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed |
C |
In what stage of systems development are design specifications created? |
B |
The primary tool for representing a system’s component processes and the flow of data between them is the |
D |
To understand and define the contents of data flows and data store, system builders use |
A |
To show each level of a system’s design, its relationship to other levels, and its place in the overall design structure, structured methodologies use |
A |
An entire information system is broken down into its subsystems by using |
A |
In object-oriented development |
C |
In an object-oriented development framework for a university, how would the classes Degree, Mathematics, and Physics be related? |
B |
Object-oriented modeling is based on the concepts of |
C |
Object-oriented development could potentially reduce the time and cost of writing software because |
C |
CASE tools automate |
D |
The oldest method for building information systems is |
D |
In the traditional systems development lifecycle, end users |
D |
In which type of systems building are the development stages organized so that tasks in one stage are completed before the tasks in the next stage begun? |
A |
As a technical project manager you have decided to propose implementing a prototyping methodology for a small Web-based design project. What is the order of steps you will follow in this project? |
B |
A systems building approach in which the system is developed as successive versions, each version reflecting requirements more accurately, is described to be |
B |
Which type of fourth-generation language tools are end-users most likely to work with? |
C |
Which type of fourth-generation language tool contains preprogrammed modules that can be used to create entire applications? |
C |
When systems are created rapidly, without a formal development methodology |
D |
Management should control the development of end-user applications by |
D |
Fourth-generation tools cannot replace conventional development tools because they |
A |
Categories of tools for BPM include all of the following except |
D |
What is the greatest barrier to successful business process change? |
D |
The process of creating workable information systems in a very short period of time is called |
A |
Which type of systems development is characterized by significantly speeding up the design phase and the generation of information requirements and involving users at an intense level? |
B |
You are an IT project manager for an advertising firm. The firm wishes to create an online tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project? |
D |
Groups of objects are assembled into software components for common functions, which can be combined into large-scale business applications, in which type of software development? |
B |
Compared to the use of proprietary components, Web services promise to be less expensive and less difficult to implement because of |
B |
________ development focuses on rapid delivery of working software by breaking a large project into a series of small sub-projects that are completed in short periods of time using iteration and continuous feedback. |
A |
INFO Test 3- (CH13)